Project Information

The project involves the design and analysis of a 100MW floating solar photovoltaic (PV) power plant at the Jatiluhur Dam in Purwakarta, West Java. This innovative project aims to utilize the surface area of the dam to install solar panels, contributing to the generation of clean and sustainable energy. By leveraging the water body, the floating solar PV plant will minimize land use and optimize energy production.

01

Client

Perum Jasa Tirta 2

03

Date

October 2021 ~ February 2022

02

Our Role

Design and Analysis

04

Category

Planning

Scoope Of Work

This project showcases our expertise in designing and analyzing large-scale renewable energy projects and our commitment to promoting sustainable energy solutions in Indonesia.

Design

Conducting a comprehensive site assessment to determine the feasibility and optimal design of the floating solar PV power plant. This includes developing detailed engineering plans for the layout of the solar panels, floating structures, anchoring systems, and electrical connections to ensure maximum efficiency and stability. The design process also incorporates considerations for environmental impact and integration with the existing dam infrastructure.

Analysis

Performing an in-depth analysis of the technical, economic, and environmental aspects of the floating solar PV power plant. This includes evaluating the potential energy output, cost-effectiveness, and environmental benefits of the project. The analysis also involves simulations and modeling to predict the performance and identify any potential risks or challenges.

Implementation Strategy

Developing a detailed implementation strategy based on the design and analysis findings. This includes creating a comprehensive project timeline, resource allocation plan, and risk management strategy to ensure smooth execution. The implementation strategy also outlines the steps for procurement, installation, and commissioning of the floating solar PV power plant.