Project Information
The PLTMH (Micro Hydro Power Plant) Wairara project involves the engineering, procurement, and construction of a 1 x 125kW hydroelectric power plant in East Sumba, East Nusa Tenggara. This project aims to harness the hydropower potential of the Wairara River to generate clean, renewable energy, contributing to the sustainable energy goals of the region and providing a reliable energy source for the local community.
Client
Ministry of Energy and Mineral Resources (EBTKE – ESDM)
Date
April 2022 ~ December 2022
Our Role
Engineering, Procurement, and Construction (EPC)
Category
Renewable Energy
Scoope Of Work
Engineering Design
Conducting a thorough analysis of the Wairara site to determine the optimal design and layout for the hydroelectric power plant. This includes developing detailed engineering plans, encompassing civil, mechanical, and electrical designs, to ensure efficient and reliable plant operation. Additionally, an environmental impact study will be conducted to assess and mitigate potential environmental impacts, ensuring compliance with local and national regulations.
Procurement
Identifying and procuring high-quality equipment and materials needed for the construction of the hydroelectric power plant. This involves coordinating with vendors and suppliers to ensure timely delivery and compliance with project specifications, as well as monitoring and controlling procurement costs to stay within the project budget.
Construction
Preparing the site for construction, including land clearing, excavation, and foundation work. Following the detailed engineering plans, all necessary components, such as turbines, generators, and control systems, will be installed. The final phase includes thorough testing and commissioning to ensure the power plant operates at optimal efficiency and meets all performance standards.