Project Information
This project involves the installation and integration of the electro-mechanical system for the Batubalai Mini Hydro Power Plant (MHPP), with a capacity of 2x1.6MW, located in Bengkulu. The project is aimed at boosting the region's renewable energy production by ensuring that the MHPP operates efficiently and integrates smoothly with the existing infrastructure. This work is crucial in meeting the area's energy demands with sustainable solutions.
- Client: PT Catur Elang Perkasa
- Our Role: EPC contractor for the installation and integration of the electro-mechanical system.
- Date : 2018
- Category: Renewable Energy, Hydro Power
Scope of Work
System Design and Engineering
Creation of a detailed engineering design for the electro-mechanical systems, tailored to the specific requirements of the Batubalai MHPP, ensuring compliance with industry standards.
Installation of Key Components
Installation of turbines, generators, and control systems, focusing on high precision and ensuring seamless integration with the power plant's existing infrastructure.
System Integration and Testing
Comprehensive integration of all electro-mechanical components followed by rigorous testing to confirm operational efficiency and reliability, ensuring the MHPP is ready for continuous operation.