Project Information

The installation of the electro-mechanical system for the Lawe Sikap Mini Hydro Power Plant (MHPP) with a capacity of 2x3.5MW is situated in Aceh Tenggara, DI Aceh. This project plays a vital role in boosting the region's energy independence by utilizing sustainable hydroelectric power, contributing to local economic growth, and ensuring a stable electricity supply.
  • Client: PT Century Abadi Perkasa
  • Our Role: EPC contractor responsible for the complete electro-mechanical system installation.
  • Date: 2021
  • Category: Renewable Energy, Hydro Power

Scope of Work

Detailed Engineering Design

Creation of comprehensive engineering plans for the electro-mechanical systems, tailored to the unique requirements of the Lawe Sikap MHPP.

Procurement and Installation

Sourcing and installation of key electro-mechanical components, including turbines, generators, and auxiliary systems, ensuring integration with the plant's infrastructure.

System Testing and Commissioning

Conducting thorough testing and commissioning procedures to validate the performance and reliability of the installed electro-mechanical systems, ensuring readiness for full-scale operation.