Development of Hybrid System of Solar PV and Diesel Power Plant for Remote Telecommunication Tower, Kutai Timur, September 2011; Project Owner: Sinar Mas Group Feasibility Study of Development of 1.2MW Biomass-based Gasification Power Plant using Empty Fruit Bunch (EFB) as feedstock in Langkat, North Sumatera, 2012 – for PT Anugerah Langkat Makmur, in partnership with PT Sawa Energy Technical Feasibility Study and Economic Analysis of Utilizing Biogas from Manure to Generate Electricity and to Substitute Fossil Based Gas as Bottled Gas, 2013 – for PT Berdikari Detail Design of PLTM Sindang Cai 1.6MW, Subang, West Java, 2012 – for PT Saksama Cipta Daya Supervision of construction works of PLTM Sindang Cai 1.6MW, Subang West Java, 2012 – for PT Saksama Cipta Daya Feasibility Study and Economic Analysis of Supplying Compressed Natural Gas (CNG) to Power Plants in Pesanggaran and Pemaron, Bali, 2013 – for PT Indonesia Power, in partnership with PT Titis Sampurna Front End Engineering Design (FEED) Compressed Natural Gas Plant for PLN Power Plant Unit at Bangkanai, Barito Utara, September 2014 Technical assistance for ISO 14064 Certification of Pertamina Hulu Energi West Madura Offshore (PHE WMO), 2014 Feasibility Study of PLTM Sungai Batanghari, Tanjung Jabung Timur, Jambi, 2014 – for PT Tirta Khatulistiwa Preparation of Tender Document and Detail Design of Mechanical part of PLTM Karekan 2x4MW Banjarnegara, Central Java, 2014 Feasiblity and Detail Design MHPP Waru 1×2.2MW and MHPP Turi 1×1.4MW in Mrican Barrage, East Java Detail Design of Penstock for MHPP Muara Bali 2×1.2MW in Bali Project Style 3
Development of Hybrid System of Solar PV and Diesel Power Plant for Remote Telecommunication Tower, Kutai Timur, September 2011; Project Owner: Sinar Mas Group
Feasibility Study of Development of 1.2MW Biomass-based Gasification Power Plant using Empty Fruit Bunch (EFB) as feedstock in Langkat, North Sumatera, 2012 – for PT Anugerah Langkat Makmur, in partnership with PT Sawa Energy
Technical Feasibility Study and Economic Analysis of Utilizing Biogas from Manure to Generate Electricity and to Substitute Fossil Based Gas as Bottled Gas, 2013 – for PT Berdikari
Supervision of construction works of PLTM Sindang Cai 1.6MW, Subang West Java, 2012 – for PT Saksama Cipta Daya
Feasibility Study and Economic Analysis of Supplying Compressed Natural Gas (CNG) to Power Plants in Pesanggaran and Pemaron, Bali, 2013 – for PT Indonesia Power, in partnership with PT Titis Sampurna
Front End Engineering Design (FEED) Compressed Natural Gas Plant for PLN Power Plant Unit at Bangkanai, Barito Utara, September 2014
Technical assistance for ISO 14064 Certification of Pertamina Hulu Energi West Madura Offshore (PHE WMO), 2014
Feasibility Study of PLTM Sungai Batanghari, Tanjung Jabung Timur, Jambi, 2014 – for PT Tirta Khatulistiwa
Preparation of Tender Document and Detail Design of Mechanical part of PLTM Karekan 2x4MW Banjarnegara, Central Java, 2014