Proyek Installation of Electro-mechanical System for MHPP Parmonangan-2 2x5MW Proyek Design and Analysis of 100MW Floating Solar PV Power Plant in Jatiluhur Dam Proyek Engineering, Procurement, and Construction of PLTMH Wairara 1 x 125kW Proyek Design, Supply and Integration, and Installation of Electro-mechanical System for MHPP Aek Pungga 1×3.5MW Proyek Engineering, Procurement, and Construction of PLTMH Tenguwe 1 x 200kW Proyek Installation of Electro-mechanical System for MHPP Cibanteng 1×4.5MW in Cianjur, Jawa Barat Proyek Installation of Electro-mechanical System for MHPP Lawe Sikap 2×3.5MW in Aceh Tenggara, DI Aceh Proyek Engineering Design, Supply & Installation of Lightning Arrester System, Power House Lighting System, and Power House Grounding System for MHPP Harjosari 3×3.3 MW in Pekalongan, Central Java (on-going) Proyek Maintenance of Electro-mechanical System for MHPP Lodagung 2x700kW in Lodagung, East Java Installation of Electro-mechanical System for MHPP Sion 2×5.0MW in Humbang Hasundutan, North Sumatera Supply and Installation five (5) units of Automatic Change Over (ACO) Panels in Bandung Area; Installation & Integration of Electro-mechanical system for MHPP Induring 2×1.0MW in Pesisir Selatan, West Sumatera; Installation of Electro-mechanical system for MHPP Tomasa 2×5.0MW in Poso, Central Sulawesi; Installation & Integration of Electro-mechanical system for MHPP Lintau 2×5.0MW in Lintau, West Sumatera; Supply and Installation four (4) units of Automatic Change Over (ACO) Panels in Bandung Supply of Automatic Change Over (ACO) Panels in Serpong, Cikokol, and Bekasi Proyek Installation & Integration of Electro-Mechanical system for MHPP Batubalai 2×1.6MW in Bengkulu Design, Supply and Installation of MV System Busduct of HPP Besai 2x45MW, Lampung Installation & Integration of Electro-mechanical system for MHPP Parmonangan 2×4.5MW in North Sumatera Design, Supply and Integration, and Installation of Electro-mechanical system for MHPP Harjosari 3×3.3MW in Pekalongan, Central Java (on-going) Proyek Design, Supply, Integration, and Installation of Electro-Mechanical System for MHPP Lambur 2x4MW in Pekalongan, Central Java Detail Design of Penstock for MHPP Muara Bali 2×1.2MW in Bali Feasiblity and Detail Design MHPP Waru 1×2.2MW and MHPP Turi 1×1.4MW in Mrican Barrage, East Java Preparation of Tender Document and Detail Design of Mechanical part of PLTM Karekan 2x4MW Banjarnegara, Central Java, 2014 Feasibility Study of PLTM Sungai Batanghari, Tanjung Jabung Timur, Jambi, 2014 – for PT Tirta Khatulistiwa Technical assistance for ISO 14064 Certification of Pertamina Hulu Energi West Madura Offshore (PHE WMO), 2014 Front End Engineering Design (FEED) Compressed Natural Gas Plant for PLN Power Plant Unit at Bangkanai, Barito Utara, September 2014 Feasibility Study and Economic Analysis of Supplying Compressed Natural Gas (CNG) to Power Plants in Pesanggaran and Pemaron, Bali, 2013 – for PT Indonesia Power, in partnership with PT Titis Sampurna Supervision of construction works of PLTM Sindang Cai 1.6MW, Subang West Java, 2012 – for PT Saksama Cipta Daya Detail Design of PLTM Sindang Cai 1.6MW, Subang, West Java, 2012 – for PT Saksama Cipta Daya Technical Feasibility Study and Economic Analysis of Utilizing Biogas from Manure to Generate Electricity and to Substitute Fossil Based Gas as Bottled Gas, 2013 – for PT Berdikari Feasibility Study of Development of 1.2MW Biomass-based Gasification Power Plant using Empty Fruit Bunch (EFB) as feedstock in Langkat, North Sumatera, 2012 – for PT Anugerah Langkat Makmur, in partnership with PT Sawa Energy Development of Hybrid System of Solar PV and Diesel Power Plant for Remote Telecommunication Tower, Kutai Timur, September 2011; Project Owner: Sinar Mas Group Project
Proyek Design, Supply and Integration, and Installation of Electro-mechanical System for MHPP Aek Pungga 1×3.5MW
Proyek Installation of Electro-mechanical System for MHPP Lawe Sikap 2×3.5MW in Aceh Tenggara, DI Aceh
Proyek Engineering Design, Supply & Installation of Lightning Arrester System, Power House Lighting System, and Power House Grounding System for MHPP Harjosari 3×3.3 MW in Pekalongan, Central Java (on-going)
Installation of Electro-mechanical System for MHPP Sion 2×5.0MW in Humbang Hasundutan, North Sumatera
Installation & Integration of Electro-mechanical system for MHPP Induring 2×1.0MW in Pesisir Selatan, West Sumatera;
Installation & Integration of Electro-mechanical system for MHPP Lintau 2×5.0MW in Lintau, West Sumatera;
Proyek Installation & Integration of Electro-Mechanical system for MHPP Batubalai 2×1.6MW in Bengkulu
Installation & Integration of Electro-mechanical system for MHPP Parmonangan 2×4.5MW in North Sumatera
Design, Supply and Integration, and Installation of Electro-mechanical system for MHPP Harjosari 3×3.3MW in Pekalongan, Central Java (on-going)
Proyek Design, Supply, Integration, and Installation of Electro-Mechanical System for MHPP Lambur 2x4MW in Pekalongan, Central Java
Preparation of Tender Document and Detail Design of Mechanical part of PLTM Karekan 2x4MW Banjarnegara, Central Java, 2014
Feasibility Study of PLTM Sungai Batanghari, Tanjung Jabung Timur, Jambi, 2014 – for PT Tirta Khatulistiwa
Technical assistance for ISO 14064 Certification of Pertamina Hulu Energi West Madura Offshore (PHE WMO), 2014
Front End Engineering Design (FEED) Compressed Natural Gas Plant for PLN Power Plant Unit at Bangkanai, Barito Utara, September 2014
Feasibility Study and Economic Analysis of Supplying Compressed Natural Gas (CNG) to Power Plants in Pesanggaran and Pemaron, Bali, 2013 – for PT Indonesia Power, in partnership with PT Titis Sampurna
Supervision of construction works of PLTM Sindang Cai 1.6MW, Subang West Java, 2012 – for PT Saksama Cipta Daya
Technical Feasibility Study and Economic Analysis of Utilizing Biogas from Manure to Generate Electricity and to Substitute Fossil Based Gas as Bottled Gas, 2013 – for PT Berdikari
Feasibility Study of Development of 1.2MW Biomass-based Gasification Power Plant using Empty Fruit Bunch (EFB) as feedstock in Langkat, North Sumatera, 2012 – for PT Anugerah Langkat Makmur, in partnership with PT Sawa Energy
Development of Hybrid System of Solar PV and Diesel Power Plant for Remote Telecommunication Tower, Kutai Timur, September 2011; Project Owner: Sinar Mas Group