Post navigation Previous PortfolioSupervision of construction works of PLTM Sindang Cai 1.6MW, Subang West Java, 2012 – for PT Saksama Cipta Daya Next PortfolioTechnical Feasibility Study and Economic Analysis of Utilizing Biogas from Manure to Generate Electricity and to Substitute Fossil Based Gas as Bottled Gas, 2013 – for PT Berdikari